One percent of the membership of Phoenix have now visited the refurb site - our lucky member to break this first barrier is Ola. Now how about we try for 5% - we have after all only been open to volunteers for a week. The site is open daytime weekdays and every second Saturday. Phone Maihan if you are coming in and if you are not sure where it is try Google Maps. Come on Down.
On the other hand volunteers from College of Northwest London (Moussa, Ibrahim, Shaban, Andreas, Edward) continue to come one day a week each and do good work, also in today was Erik from Archway who read about Phoenix online and is interested in becomming a member (as is Ibrahim). The electrical installations of the four mid-floor flats (99,97,95,93) have been certified today and the installation of the kitchens in them is proceeding well. Tommorow we begin painting in 97 (and perhaps 95) - Darryl (a Phoenix member) and Erik having spent a lot of time sanding down the walls.
The power is finally on in room 101 - EDF having pronounced themselves pleased with the installation. We have a toilet, hot water, two sinks, a kettle, a fridge, tea bags, milk and sugar, helath and safety notices cover the walls.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment