Wednesday, 26 October 2011

a setback

After months of uneventful progress and hard work on the Spey Street Refurb there has been a set back - I'll let Colin tell you about it;

Unfortunately 95 Spey Street was targeted last night by thieves wanting the copper piping... Steve and I attended the site from 10pm till around midnight last night. The Police, London Fire Brigade, Poplar HARCA and the Water Board also attended.

Copper piping was removed from the bedsitting room in 95 and some damage was done to the bathroom, however not much was actually taken, the most damage occurred because a service pipe located in the ducting in the bathroom had been cut and therefore a substantial amount of water penetrated both 95 and 93 and also 85 and 87 on the ground floor. Steve managed to locate the stopcocks in the lofts and we had to turn off the water supply to the whole block. Poplar HARCA will attend today to re-cap the service pipe, re-instate the water supply and check for leaks. As you know the site was due to be closed today because Steve is at a funeral so Carlita and/or me will be liaising with HARCA once this work is complete. We will also be discussing, on Steve’s return additional security measures for the site in light of last night.

On the phone today Steve estimated that this would set the project back about 3 weeks - it is fortunate that we were so far ahead.

No comments:

Post a Comment