Friday, 7 October 2011

The Young Ones

or at least that's what it sounded like Steve was singing. Steve, Pat, Paul and Erik worked Friday - mostly tidying up and taking the boards off number 85 (the former rubbish store) and putting the windows back in. Erik got on with sanding down and painting the bathroom in number 97. 95 is basically done (and very chi-chi it looks too) - Colin showed it to our first prespective tenant yesterday. There's a lot of interest in the garden flats - but sadly only two of the groundfloor flats have gardens and they won't be available for a long time yet.

Not much can be done about the patio doors - this will require an outside contractor because the hinges weren't there in the flats - so this is still boarded up. By the end of the day 85 did look much better.

Looking forward to seeing you Saturday.

No comments:

Post a Comment